Tokyu disposed of 50% of its lands for sale by 1975, bringing the Garden City's population to 200,000, about 50% of the planned population. By then, the Land Readjustment project was underway at 84% of the total area. The project area began to show its overall framework with the opening of Den-en-toshi Line's Shibuya Station and its interconnection with a subway line approaching. Development also progressed at lands held by local landowners in various forms such as rental properties, reinforcing the trend for population growth. Earlier in1973, Tokyu revised its master plan into the Amenity Plan. Around the time of railway opening in the early days of development, priority was given to allocating population along the railway route in an active campaign to invite the establishment of public housing complexes. While the target population density was initially set at 90 people per hectare, the size of each land plot for sale was reduced as the skyrocketing land prices due to the tide of the nation's strong economic growth caused the price of each plot to exceed the amount that a normal salaried worker could afford.
机译:东急市到1975年出售了其50%的土地,使花园城市的人口达到20万,约占计划人口的50%。那时,土地调整项目正在进行,占总面积的84%。随着Den-en-toshi线涩谷站的开放以及与地铁线的互连,该项目区域开始显示其总体框架。当地土地所有者以各种形式(例如出租物业)持有的土地的开发也取得了进展,从而加强了人口增长的趋势。 1973年初,东急将其总体规划修订为“便利设施计划”。在发展初期,铁路开通前后,在一项积极的活动中优先考虑在铁路沿线分配人口,以邀请他们建立公共住房综合体。尽管最初的目标人口密度最初设定为每公顷90人,但由于该国强劲的经济增长潮汐导致地价飞涨,导致每块土地的价格超过普通受薪工人负担得起。

著录项

  • 来源
    《建築と都市》 |2013年第517speca期|166-176|共11页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:46:55

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号