A New Estimation at Completion of Project’s Time and Cost Approach Based on Particle Filter

机译:基于粒子滤波器完成项目时间和成本方法的新估计

获取原文
获取原文并翻译 | 示例
           

摘要

Estimation at completion is an important tool for supervising the performance and risk of each project, in order to estimate the project completion time and final cost. This calculation is one of the most important goals of project managing. In this paper, a newestimation at completion approach is presented for estimation of finishing time and final cost of the project. The innovation of this paper can be organized as using particle filter as one of the strong nonlinear filtering methods for next estimation state of the system by using smoothed data which is done by filter itself, based on autoregressive fitted model. After estimating next states, it will be possible to predict system’s reaction in later seconds and the time and cost of finishing the project are estimated for comparing the performance and efficiency of invented method. The simulation results demonstrate the performance of proposed scheme in comparison with older approach.
机译:完成时估计是监督每个项目的性能和风险的重要工具,以估计项目完成时间和最终成本。此计算是项目管理最重要的目标之一。本文介绍了完成方法的新阶段,以估计项目的整理时间和最终成本。本文的创新可以根据使用滤波器本身通过滤波本身完成的平滑数据作为系统的下一个估计状态的强烈非线性滤波方法之一,根据自回归拟合模型组织。在估计下一个状态之后,可以在后面的秒内预测系统的反应,估计该项目的完成时间和成本用于比较发明方法的性能和效率。仿真结果表明,与旧方法相比,提出了建议方案的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号