首页> 外文期刊>IEEE Transactions on Applied Superconductivity >ATLAS End Cap Toroid Final Integration, Test and Installation
【24h】

ATLAS End Cap Toroid Final Integration, Test and Installation

机译:ATLAS端盖环型最终集成,测试和安装

获取原文
获取原文并翻译 | 示例

摘要

The ATLAS Experiment at LHC, CERN will utilize a large, superconducting, air-cored toroidal magnet system with a long Barrel Toroid and two End Cap Toroids. Each End Cap Toroid contains eight racetrack coils mounted as a single cold mass in a cryostat vessel of approximately 10 m diameter and 5 m length. The operating current is 20.5 kA at 0.25 GJ stored energy and a peak field of 4.1 T in the windings. This paper presents the status of the End Cap Toroid Project. Final integration of the two cold masses, 120 tons each, into their respective vacuum cryostats is described. The specialized techniques, procedures and tooling infrastructure required for these operations are explained. Pre-installation cooldown to 85 K is reported. Installation of the toroids in the ATLAS cavern 100 m underground will be described. The final interfacing to the Barrel Toroid and services in the cavern will be reviewed along with preparations for final test and commissioning.
机译:位于欧洲核子研究中心(CHC)LHC的ATLAS实验将利用大型超导空芯环形磁石系统,该系统带有一个长桶形环形线圈和两个端盖环形线圈。每个End Cap环形线圈包含八个跑道线圈,它们作为单个冷物质安装在直径约10 m,长度约5 m的低温恒温器容器中。在0.25 GJ的存储能量和绕组中4.1 T的峰值磁场下,工作电流为20.5 kA。本文介绍了End Cap Toroid项目的状态。描述了将两个冷块(每个120吨)最终集成到它们各自的真​​空低温恒温器中的过程。说明了这些操作所需的专门技术,过程和工具基础结构。据报道安装前的冷却时间为85K。将描述环形线圈在地下100 m的ATLAS洞穴中的安装。将审查与桶形环网和洞穴中服务的最终接口,以及最终测试和调试的准备工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号