...
首页> 外文期刊>Applied Superconductivity, IEEE Transactions on >Design Approach and Analysis Results for Structure Feeders of ITER Magnets
【24h】

Design Approach and Analysis Results for Structure Feeders of ITER Magnets

机译:ITER磁体结构馈线的设计方法和分析结果

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The superconducting magnet system of ITER has $sim$5,000 tons of cold mass as steel structures to support the gravity and electromagnetic forces. These steel structures need to be maintained at $sim$4.4 K during magnet operations. The magnet system has three STR (structure) feeders for distribution, monitoring and control of helium to remove heat loads from these large steel structures during cool down and normal operation. One SHe (supercritical helium) circulation pump for flow rate of $sim$ 2.7 kg/s, in a closed loop is used only for cooling of structures, and these 3 STR feeders are part of this loop. Each STR feeder has 3 main components: SCVB (structure cooling valve box), CFT (cryostat feed through) and ICF (in-cryostat feeder). Unlike the coil feeders, STR feeders do not have bus bars, current leads & SBB (“S”-bend box), and present some difference in the design approach. The SCVB is placed outside the enclosure of the nuclear radiation shield and hence contains elements needing maintenance like valves and instruments required for diagnosis and operation of the cooling paths. Each SCVB has to accommodate about 20 valves within a limited available space. Some SHe lines will have running length of about 50 m from SCVB to coil structures, but the layout is such that the use of expansion joints can be avoided. The details of the design approach and analysis results will be presented in this paper.
机译:ITER的超导磁体系统具有5,000美元的冷态质量,作为钢结构来支撑重力和电磁力。在磁铁操作期间,这些钢结构需要保持在sim $ 4.4K。磁铁系统具有三个STR(结构)供料器,用于分配,监视和控制氦气,以在冷却和正常运行期间消除这些大型钢结构的热负荷。一台SHe(超临界氦)循环泵在闭环中的流量为sim $ 2.7 kg / s,仅用于结构的冷却,这3个STR进料器是该环路的一部分。每个STR进料器都有3个主要组件:SCVB(结构冷却阀箱),CFT(低温恒温器直通)和ICF(低温恒温器内进料器)。与线圈馈线不同,STR馈线没有母线,电流引线和SBB(“ S”形弯头盒),并且在设计方法上存在一些差异。 SCVB放置在核辐射屏蔽罩的外部,因此包含需要维护的元件,例如诊断和操作冷却路径所需的阀门和仪器。每个SCVB必须在有限的可用空间内容纳约20个阀门。某些SHe管线从SCVB到线圈结构的走线长度约为50 m,但布局应避免使用伸缩缝。本文将介绍设计方法和分析结果的详细信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号