首页> 外文期刊>Applied Energy >Simulation-based performance evaluation of model predictive control for building energy systems
【24h】

Simulation-based performance evaluation of model predictive control for building energy systems

机译:基于模拟的建筑能源系统模型预测控制性能评价

获取原文
获取原文并翻译 | 示例
           

摘要

The performance of model predictive control can be significantly affected by different choices of controller parameters such as the time intervals for model discretization and control sampling. Due to the lack of a systematic understanding on how these parameters affect the control performance, they are usually selected arbitrarily in practice. In this paper, the combined impacts of selected time intervals for model discretization and control sampling on the performance of model predictive control are comprehensively investigated for the first time through detailed simulations. The simulation results reveal that the time interval for model discretization has a much greater influence on the performance of model predictive control than that for control sampling by affecting the prediction performance, cost saving, and computation time simultaneously. In particular, there are three findings on the time interval for model discretization that are specific to the case studies considered herein. First, it affects the performance of multi-period prediction in a non-linear manner so that it is not always better to have a smaller time interval for model discretization. Second, it has four times greater influence on the resulting cost saving from model predictive control than the time interval for control sampling. Last, it affects the computation time significantly. The increase of the time interval for model discretization from 1 min to 5 min can reduce the computation time by roughly 96%. The proposed simulation-based performance evaluation sheds light on the importance of selecting appropriate time intervals for practical applications of model predictive control to building energy management.
机译:模型预测控制的性能可能受到控制器参数的不同选择的显着影响,例如模型离散化和控制采样的时间间隔。由于缺乏对这些参数如何影响控制性能的系统理解,通常在实践中任意选择。本文首次通过详细仿真全面地研究了所选时间间隔对模型预测控制性能的模型离散化和控制采样的组合影响。仿真结果表明,模型离散化的时间间隔对模型预测控制的性能产生了更大的影响,这是通过影响预测性能,成本节省和计算时间来控制采样的模型预测控制的性能。特别地,有三个关于模型离散化的时间间隔的发现,该模型离散化特定于本文所考虑的案例研究。首先,它以非线性方式影响多周期预测的性能,使得对于模型离散化的较小时间间隔并不总是更好的。其次,它对从模型预测控制产生的成本节省超过了比控制采样的时间间隔产生了四倍。最后,它显着影响计算时间。从1分钟到5分钟的模型离散化的时间间隔的增加可以减少计算时间大约为96%。基于模拟的仿真性能评估揭示了选择模型预测控制的适当时间间隔的重要性,以便建立能源管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号