...
【24h】

Transports

机译:运输

获取原文
获取原文并翻译 | 示例

摘要

Brief: A heavy-lift, air refuelable cargo transport for massive strategic airlift over long ranges, including oversize cargo. Function: Cargo and troop transport. Operator: AMC, ANG, AFRC. First Flight: June 30, 1968. Delivered: October 1969-April 1989. IOC: September 1970. Production: 131. Inventory: 42 C-5A; 43 C-5B; two C-5C; seven C-5M. Aircraft Location: Dover AFB, Del.; Eastern West Virginia Arpt., W.Va.; JBSA-Lackland, Tex.; Memphis Arpt.,Tenn.; Stewart ANGB, N.Y.;Travis AFB, Calif.;Westover ARB, Mass.;Wright-Patterson AFB, Ohio. Contractor: Lockheed Martin. Power Plant: four General Electric TF39-GE-1C turbofans, each 43,000 Ib thrust; (C-5M) four General Electric F138-GE-100 turbofans. Accommodation: crew: two pilots, two flight engineers, three loadmasters. Load: 81 troops and 36 standard pallets, max 270,000 Ib.There is no piece of Army combat equipment the C-5 can't carry.
机译:简介:重型可空中加油的货物运输,可进行远距离大规模战略空运,包括超大型货物。功能:货物和部队运输。操作员:AMC,ANG,AFRC。首次飞行:1968年6月30日。交付时间:1969年10月至1989年4月。国际奥委会:1970年9月。产量:131。库存:42 C-5A;飞机:1。 43 C-5B;两架C-5C;七架C-5M飞机位置:特拉华州多佛空军基地;西弗吉尼亚州东弗吉尼亚州立大学;德克萨斯州JBSA-拉克兰市;田纳西州孟菲斯机场;纽约州Stewart ANGB;加利福尼亚州特拉维斯空军基地;马萨诸塞州韦斯特奥弗空军基地;俄亥俄州怀特-帕特森空军基地。承包商:洛克希德·马丁公司。电厂:四台通用电气TF39-GE-1C涡轮风扇,每台推力为43,000 Ib; (C-5M)四架通用电气F138-GE-100涡轮风扇。住宿:机组人员:两名飞行员,两名飞行工程师,三名负荷主管。负载:81名士兵和36个标准货盘,最大270,000磅.C-5不能携带任何陆军作战装备。

著录项

  • 来源
    《Air Force Magazine 》 |2012年第5期| p.94-98| 共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号