Due to surgery duration variability and arrivals of emergency surgeries, the planned Operating Room (OR) schedule is disrupted throughout the day which may lead to a change in the start time of the elective surgeries. These changes may result in undesirable situations for patients, wards or other involved departments, and therefore, the OR schedule has to be adjusted. In this paper, we develop a decision support system (DSS) which assists the OR manager in this decision by providing the three best adjusted OR schedules. The system considers the preferences of all involved stakeholders and only evaluates the OR schedules that satisfy the imposed resource constraints. The decision rules used for this system are based on a thorough analysis of the OR rescheduling problem. We model this problem as an Integer Linear Program (ILP) which objective is to minimize the deviation from the preferences of the considered stakeholders. By applying this ILP to instances from practice, we determined that the given preferences mainly lead to (i) shifting a surgery and (ii) scheduling a break between two surgeries. By using these changes in the DSS, the performed simulation study shows that less surgeries are canceled and patients and wards are more satisfied, but also that the perceived workload of several departments increases to compensate this. The system can also be used to judge the acceptability of a proposed initial OR schedule.
机译:由于手术持续时间的变化和急诊手术的到来,整天计划的手术室(OR)计划被中断,这可能会导致择期手术的开始时间发生变化。这些更改可能会给患者,病房或其他相关部门带来不希望的情况,因此必须调整OR计划。在本文中,我们开发了决策支持系统(DSS),它通过提供三个最佳调整的OR计划来协助OR经理做出此决策。系统考虑所有相关利益相关者的偏好,仅评估满足强加的资源约束的OR计划。用于此系统的决策规则基于对OR重新调度问题的全面分析。我们将此问题建模为整数线性程序(ILP),目的是最大程度地减少与考虑的利益相关者的偏好的偏差。通过将此ILP应用于实践实例,我们确定了给定的偏好主要导致(i)转移手术和(ii)安排两次手术之间的休息时间。通过使用DSS中的这些变化,进行的模拟研究表明,取消了更少的手术,使患者和病房更加满意,而且各个部门的可感知工作量增加了,以弥补这一点。该系统还可用于判断建议的初始OR计划的可接受性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号