BackgroundPercutaneous vertebroplasty (PV) is generally performed under fluoroscopic guidance. Technically, single fluoroscope is considered sufficient for effectively monitoring PV. However, single fluoroscopic technique might be time-consuming in rotating the C-arm of the fluoroscope for either antero-posterior (AP) or lateral radiographic view, and causing delay in detecting cement leakage that can occur if the correct sight is not given. The aim of the current investigation was to compare the efficacy and safety of performing PV using one or two sets of fluoroscope.
展开▼