The New Austrian Tunneling Method is applied in the excavation of No. 1 and 2 diveision tunnels of Bailianhe Pumped-storage Power Station. By adopting appropriate construction methods and scientific construction organization and management, the construction progress and quality of diversion tunnels are ensured, and the adverse geological sections are quickly and safely passed through. The deformation monitor and acoustic testes during construction period show that the excavation and supporting of diversion tunnels are scientific and reasonable.%白莲河抽水蓄能电站1、2号引水隧洞开挖支护采用“新奥法”施工.通过采用适当的施工方法及科学的施工组织管理,引水隧洞施工进度及质量得到了保证,并安全快速地穿越了不良地质段.施工期安全变形监测和声波测试结果表明,白莲河抽水蓄能电站引水隧洞开挖、支护施工方案是科学、合理的.