In recent years, with the development of economy, Chinese highway construction developed rapidly. Due to the large span of some highway bridges that need the deep ditch canyon, the lower part often adopts the high bridge pier co-nstruction. This article discusses the thin-wal ed high pier con-struction technology of Shujiacao no.1 Bridge in Yiba highway, and provides some advice for reference.%近年来,随着经济的发展,我国高速公路建设也快速发展。一些需要跨越过深沟峡谷的高速公路桥梁,由于桥梁跨度大,下部构造常常采用高桥墩。本文将对宜巴高速公路舒家槽1号桥空心板薄壁高墩施工技术进行探讨,并提供一些意见供参考。
展开▼