This thesis introduces a systematic summary and analysis on the design thinking and meth-ods of subway project.It identifies that we should firstly find out the controlling factors during the designing progress,and then propose the feasible solutions upon these factors,and finally compare and analyze all solutions as per the function,technology,economic aspects and our previous experi-ence to produce the optimal solution for implementation.%对地铁工程的设计思路和方法进行了总结和分析,指出地铁方案设计中的控制因素,针对这些控制因素提出可行的解决方法,并对各方法从功能、技术、经济等方面进行比较和分析,同时结合实际经验,最终确定最优化的方案进行实施。
展开▼