首页> 外文期刊>天津大学学报(英文版) >Real-Time Temperature Control for High Arch Dam Based on Decision Support System
【24h】

Real-Time Temperature Control for High Arch Dam Based on Decision Support System

机译:基于决策支持系统的高拱坝实时温度控制

获取原文
获取原文并翻译 | 示例
       

摘要

It is important and difficult to control the temperature of mass concrete structure during high arch dam construction. A new method with decision support system is presented for temperature control and crack prevention. It is a database system with functions of data storage, information inquiry, data analysis, early warning and resource sharing. Monitoring information during construction can be digitized via this system, and the intelligent analysis and dynamic control of concrete temperature can be conducted. This method has been applied in the construction of the Dagangshan Arch Dam in China and has proven to be very convenient. Based on the decision support of this system and the dynamic adjustment of construction measures, the concrete temperature of this project is well-controlled.
机译:在高拱坝施工期间,控制大体积混凝土结构的温度既重要又困难。提出了一种具有决策支持系统的温度控制和裂纹预防新方法。它是一个具有数据存储,信息查询,数据分析,预警和资源共享功能的数据库系统。通过该系统可以将施工过程中的监控信息数字化,并可以对混凝土温度进行智能分析和动态控制。该方法已在中国大港山拱坝的建设中得到了应用,并被证明非常方便。基于该系统的决策支持和施工措施的动态调整,可以很好地控制该项目的混凝土温度。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号