首页> 中文期刊> 《中国工程科学:英文版 》 >Assistant pullback technique for main span closure of Sutong Bridge

Assistant pullback technique for main span closure of Sutong Bridge

             

摘要

Sutong Bridge is a cable-stayed steel box girder bridge with a main span of 1 088 m.The erection of upper structure adopts geometry control method and requires no change to the unit's size and the structure's none-stress geometry.Before main span closure,the cantilever of girder reaches 540.8 m,the structure state is noticeably influenced by external circumstances,the main span closure face great difficulty.By abstracting the advantage of the pullback method abroad and the domestic temperature-cutting method,a new assistant pullback method have put forward and bring into practice actually.In this paper,the analysis key point of practice conditions,key parameter of practice,main measures of the method and the performance is introduced.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号