For the problem current number of lockage every day of the Three Gorges lock can't meet it's design level, the mechanical traction technology was put forth to assist the fast grouping for ship in and out of the ship-lock.The application feasibility of this technology in the new channel of Three Gorges project Dam waterway was demonstrated.%针对三峡船闸现行每天运行闸次数达不到设计水平的问题,提出采用机械牵引方式协助船舶成组快速进出闸,将此技术应用于三峡工程水运新通道建设,论证其可行性.
展开▼