Combining with the construction technology scheme of Nanning big bridge upper structure,this paper discussed the temporary cable tower structure design,according to the particularity of temporary cable tower structure,analyzed the concept and design principles of temporary cable tower,and elaborated the structural design method,in order to meet the functional requirements of temporary cable tower.%结合南宁大桥主桥上部结构施工技术方案,对临时索塔结构设计进行了讨论,针对临时索塔构造的特殊性,分析了临时索塔的构思及设计原则,并对其构造设计方法进行了阐述,以满足临时索塔的功能要求。
展开▼