Construction technology about USP warm mix modified asphalt is studied by analyzing raw material,the mix proportion design,con-struction preparation and technology. The research indicates that:the water and dust content of USP warm mix modified asphalt should be con-trolled,the mixing time is ten seconds longer,it needs 24 h for asphalt solidification after compaction,and then secondary compacting.%从原材料选择和配合比设计、施工准备、施工工艺等环节出发,分析了USP温拌改性沥青混合料的施工技术,研究表明:USP温拌改性沥青混合料应严格控制集料含水量和粉尘含量;拌和时间延长10 s左右;压实后养生24 h,再进行二次碾压。
展开▼
机译:工程的组织工作部署取得的第20类浮桥材料/Организацияинженерныхработприустройствепонтонногомостакласса20наместеперехода/ Organizacijainžinjerijskihradova pRI uspostavljanju mosnog mEsTa prelaska OD pontonskog materijala klase 20的桥交叉点