介绍了高等级公路沥青混凝土路面施工工艺流程,从混合料生产、运输、摊铺、碾压与协调服务五大关键点入手,提出施工工艺系统控制要点和方法,并通过实践验证了该控制方案的合理有效性.%The paper introduces the construction craft procedure for the asphalt concrete roadbed on high-grade expressways,points out the controlling points and methods for the craft system from the mixture production,transportation,pavement,compaction and coordinative service,and proves the controlling scheme is effective and reasonable.
展开▼