基于掘进施工存在的劳动组织不合理、工序衔接、工时利用不紧密、综掘开机率低等问题,采取优化劳动组织和工艺工序等措施,达到了提升单进水平和劳动效率,效果明显,已经在矿区得到大力推广和应用。%Based on the existing problems of the excavation construction that the labor organization is unreasonable, the procedure connection and the use of the working hours not closely and the using rate of fully mechanized is low, take labor organization and process optimization, and other measures to improve into a tunneling level of single cycle and work efifciency, which has the obvious effect, and has been popularized and applied in the mining area.
展开▼