首页> 中文期刊>铁道标准设计 >以邢台东站为例谈既有站综合交通枢纽规划与改造提升

以邢台东站为例谈既有站综合交通枢纽规划与改造提升

     

摘要

随着既有站成为综合交通枢纽,需要对其进行规划和改造.以邢台东站为例,通过概况分析、客流量与规模预测,归纳邢台东站综合交通枢纽现状核心问题;通过思路比选,提出推荐研究思路,说明其规划设计要点,总结既有站综合交通枢纽规划改造的工作要点.%To change an existing railway station to a comprehensive traffic hub,planning and renovation are required.Taking Xingtai East Railway Station as an example,this study concludes core issues of Xingtai east railway station traffic hub based on the analysis of the general situation and the forecast of passenger flow and construction scale,and puts forward recommended research concepts.It also illustrates key points of planning and designing and summarizes work focuses in planning and renovation of the existing comprehensive traffic hub.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号