首页> 中文期刊> 《油气田地面工程》 >顶管法隧道穿越技术在浙江软土地区的应用

顶管法隧道穿越技术在浙江软土地区的应用

         

摘要

顶管法隧道穿越作为非开挖穿越方式的一种,现已广泛应用于油气管道的河流穿越中.顶管法隧道穿越技术应用中,竖井形式的确定、穿越层位及顶管机的选择是决定工程能否成功的关键因素.南昌—上海支干线穿越浙江软土地区的顶管法隧道设计中,对竖井形式进行了优化,尤其是成功地应用了大刃脚形式,同时根据现场情况合理地选择了穿越层位以及不同型式的顶管机,保证了工程的顺利竣工.%As one of the trenchless crossing methods,the pipe jacking crossing for tunnels has been widely used in river crossing for oil and gas pipelines.In the application of pipe jacking crossing technology for tunnels,shaft pattern confirmation and selection of crossing positions and jacking machines are the key factors to the success ofthe project.In the design of the pipe Jacking tunnel in NanchangShanghai branch and trunk lines that cross mollisol areas oFZhejiang,the shaft patterns are optimized,and in particular the big blade foot pattern is applied successfully.Meanwhile,crossing positions and different patterns of pipe jacking machines are also selected reasonably according to site conditions,which ensure the successful completion of the project.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号