首页> 外文会议>Advances in geotechnical engineering >Subsurface Characterization and Geotechnical Design for a Cut-and-Cover Tunnel in Soft Ground in San Francisco
【24h】

Subsurface Characterization and Geotechnical Design for a Cut-and-Cover Tunnel in Soft Ground in San Francisco

机译:旧金山软土地基穿越隧道的地下特征与岩土工程设计

获取原文

摘要

The proposed Main Post Tunnels are part of the Doyle Drive Replacement Projectin San Francisco, California to improve the existing roadway access south of the GoldenGate Bridge. The tunnels will be a cut-and-cover structure of about 305 m in length and38 m in width involving 4-m deep excavation and 10- to 12-m backfill/embankment dueto aesthetic requirements. Various geotechnical investigations and testing were performedto characterize the subsurface conditions, including borings, cone penetration tests andlaboratory shear strength tests. The geotechnical investigations and analyses indicate thatthe tunnel subsurface consists of a total of 8 to 10 m thick saturated loose sands(including sand of hydraulic fill and marine sand) and soft clay which are subject to largedeformation due to consolidation and potential liquefaction. A number of groundimprovement methods were evaluated and cement deep soil mixing (CDSM) wasidentified as the preferred mitigation method. The CDSM panels will be constructed in agrid pattern and will have 30 to 40 percent of area replacement ratio.
机译:拟议的主要邮政隧道是道尔驱动器更换项目的一部分 在加利福尼亚州的旧金山,以改善Golden南部的现有道路通道 门桥。这些隧道将是一个长约305 m的挖填式结构, 宽度38 m,包括4 m深的开挖和10至12 m的回填/路堤 达到美学要求。进行了各种岩土调查和测试 表征地下条件,包括钻孔,圆锥体渗透试验和 实验室抗剪强度测试。岩土工程调查和分析表明: 隧道地下总共由8至10 m厚的饱和疏松砂岩组成 (包括水力充填砂和海洋砂)和软土,它们会受到较大影响 由于固结和潜在的液化而变形。一些地面 评估了改善方法,并进行了水泥深层搅拌(CDSM) 确定为首选的缓解方法。 CDSM面板将以 网格图案,并具有30%到40%的面积替换率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号