For now, many wastewater treatment projects hasn't carry out full and careful commissioning after installation. As a result, many system can’t be normally operated,or the discharged wastewater quality below standards, or the running cost is high. In fact, whether the treatment system is carried out well, full and careful process commissioning is a critical key.% 目前,很多废水处理项目在安装结束后没有进行全面、细致的工艺调试,从而造成系统要么老是出问题,不能正常运行,要么出水水质不能达到设计要求或运行成本偏高等现象。而事实上,工艺调试是废水处理站投入运行前的一项重要工作,是关系到其能否正常运行、效益能否充分实现的关键。文章就某电镀废水项目的工艺调试所碰到的一些简单问题进行了经验总结,并提出了笔者自己的一些看法和改进措施