In view of 5 000 t/a electrolytic nickel project, six stages from decision-making to completion of the project were described. The necessity of investment control of the project was explained from the perspective of design orientation. The means and methods for project investment control were discussed briefly.%针对5000 t/a电解镍项目,阐述了项目从决策到竣工所经历的6个阶段.从设计定位角度人手,说明了项目投资控制的必要性,浅析了项目投资控制手段及方法.