首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >A Brief Discussion on investment Control of Subway Construction Projects - Taking the Hangzhou Subway Project as the Example
【24h】

A Brief Discussion on investment Control of Subway Construction Projects - Taking the Hangzhou Subway Project as the Example

机译:浅谈地铁建设项目投资控制 - 以杭州地铁工程为例

获取原文

摘要

Through the elaboration of the management towards the whole process of preliminary feasibility demonstration, planning of design, construction process and completion settlement about Hangzhou subway construction project, the paper summarizes and analyzes the conditions of subway construction project in the aspect of investment control management, in addition to the analysis of the reasons for some problems occurred and finally puts forward some measures and suggestions to improve the investment control management of subway construction project with an aim to enhance the ability of investment control management towards the subway construction projects in Hangzhou and other domestic regions.
机译:通过阐述管理整个过程初步可行性示范,设计,建设流程和完成解决方面的杭州地铁建设项目,总结和分析了投资控制管理方面的地铁建设项目的条件, 除了分析一些问题的原因外,最终提出了一些措施和建议,提高地铁建设项目的投资控制管理,旨在提高杭州地铁建设项目的投资控制管理能力 地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号