Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2

机译:地铁项目的风险识别与评估:以南京地铁2号线为例

获取原文
获取原文并翻译 | 示例
       

摘要

Underground subways are constructed in major cities across China to overcome the transportation problems in the urbanization process. The aim is to develop a comprehensive risk checklist associated with subway projects and a methodology to assess the risks at the early stage of a project. Based on the analysis of accidents that have happened in previous projects, a review of current literature and the results of interviews, a comprehensive risk checklist was developed, followed by proposing a risk analysis methodology using fuzzy analytical hierarchy process (AHP). Then the Nanjing Subway Line 2 project was analysed using the proposed risk checklist and fuzzy AHP method. The data were obtained through interviews and two rounds of questionnaire surveys with the personnel directly involved in the Nanjing Subway Line 2 project. The results of risk identification and assessment are presented and their managerial implications are discussed. The information presented here should be relevant to both academics and practitioners in the field of subway project management.
机译:为了克服城市化进程中的交通问题,中国各大城市都修建了地下地铁。目的是制定与地铁项目相关的综合风险清单,以及在项目早期评估风险的方法。基于对先前项目中发生的事故的分析,对当前文献的回顾和访谈结果,制定了全面的风险清单,然后提出了使用模糊层次分析法(AHP)的风险分析方法。然后,使用拟议的风险清单和模糊层次分析法对南京地铁2号线项目进行了分析。数据是通过与直接参与南京地铁2号线项目的人员进行的访谈和两轮问卷调查获得的。介绍了风险识别和评估的结果,并讨论了其管理意义。这里介绍的信息应该与地铁项目管理领域的学者和实践者都息息相关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号