With the aim of multi-processed resource allocation problem under the service-oriented manufacturing paradigm, the mathematical model for this problem is built with the total flow time as the optimal objective, the multi-service-oriented resource as the allocation objective and taking cost and time factors into comprehensive consideration. Also, the simulation annealing algorithm with memory is designed for carrying out the solution to the problems. The results obtained from actual examples indicate that the mathematical model for the problem is correct, and that the solution algorithm is effective.%针对服务型制造模式下的多工艺资源配置问题,以总流程时间为优化目标,以多种服务化资源为配置对象,综合考虑成本和时间因素,建立了该问题的数学模型,并利用带记忆的模拟退火算法对该问题进行求解.实例结果表明,该问题的数学模型正确,求解算法有效.
展开▼