首页> 中文期刊>中国安全生产科学技术 >地铁隧道施工安全风险演化的BP-SD模型研究

地铁隧道施工安全风险演化的BP-SD模型研究

     

摘要

In order to deeply study the dynamic evolution process of construction risk of subway tunnel , a BP-SD model for construction risk evolution of subway tunnel was constructed and the causal relationship and influencing functions of the influ -ence factors in the model were determined by combining with the system dynamics ( SD) , error back propagation ( BP) neu-ral network and mean influence value ( MIV) algorithm.The simulation results of the model showed that the change of safety management risk system value and construction personnel risk system value had the greatest impact on the construction risk value of subway tunnel , while the impact by the change of construction environment system value took the second place , and the change of the mechanical equipment system value had the least impact .Therefore , the occurrence probability of construc-tion risk of subway tunnel can be controlled through reducing the safety management risk value and the construction personnel risk value .%为深入研究地铁隧道施工风险的动态演化过程,结合系统动力学(SD)、误差反向传播(BP)神经网络与平均影响值(MIV)算法,确定模型中影响因素间的因果关系和影响函数,构建地铁隧道施工风险演化的BP-SD模型.模型仿真结果表明:安全管理风险系统与施工人员风险系统的值的变化对地铁隧道施工风险值影响最大,施工环境系统的值的变化对地铁隧道施工风险值影响次之,机械设备系统的值的变化对地铁隧道施工风险值影响最小.因此,可通过降低安全管理风险值与施工人员风险值控制地铁隧道施工风险发生的概率.

著录项

  • 来源
    《中国安全生产科学技术》|2017年第12期|67-72|共6页
  • 作者单位

    三峡大学湖北省水电工程施工与管理重点实验室,湖北宜昌443002;

    三峡大学水利与环境学院,湖北宜昌443002;

    三峡大学湖北省水电工程施工与管理重点实验室,湖北宜昌443002;

    三峡大学水利与环境学院,湖北宜昌443002;

    三峡大学湖北省水电工程施工与管理重点实验室,湖北宜昌443002;

    三峡大学水利与环境学院,湖北宜昌443002;

    广东省水文局茂名水文分局,广东茂名525000;

    三峡大学湖北省水电工程施工与管理重点实验室,湖北宜昌443002;

    三峡大学水利与环境学院,湖北宜昌443002;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 X937;
  • 关键词

    地铁隧道; 施工安全; 风险演化; BP-SD模型; 仿真;

  • 入库时间 2022-08-17 18:13:10

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号