首页> 中文期刊> 《实验流体力学》 >进气道AIP面测压装置加装方案研究

进气道AIP面测压装置加装方案研究

         

摘要

To discuss the transition part deformation of installing test equipment at AIP dur-ing inlet/engine compatibility flight tests,an evaluation index of transition part radial deforma-tion is developed and applied in engineering calculation.Moreover,influences of perforating,in-stalling static pressure base and total pressure test rake on the radial size of the transition part are compared and analyzed.Accordingly,it is indicated that installing pressure test device at AIP may force the radial size to deviate from the designed value and standard circle;welding static pressure test base may introduce obvious deformation while riveting may introduce less deforma-tion relatively;restricting on both sides of the total pressure test rake may not seriously influence the radial size whereas effectively restrain its vibration amplitude.The optimized installation scheme of the pressure measuring device has been adopted in engineering.%针对进气道/发动机相容性试飞中 AIP上测量装置加装而引起过渡段变形问题,建立了过渡段径向形状变化评价指标并应用于工程计算,对比分析了过渡段上开孔、加装静压座、总压测量耙加装对过渡段径向尺寸的影响。结果表明:过渡段AIP面上加装测压装置使得过渡段径向尺寸偏离设计值及标准圆;焊接静压座会使过渡段径向尺寸发生较为明显变形,而铆接静压座则影响相对较小;总压测量耙采用两端约束的方案不会对过渡段径向尺寸造成较为严重的影响,但会有效地抑制测量耙的振动幅值。该结果已经应用于工程中,优化了测压装置加装方案。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号