Workload list checking is of great importance for international projects in“Deliver Keys” mode to avoid risks and increase efficiency.The importance of workload list checking for international projects in EPC ( Engineering, Pro-curement and Construction) mode are discussed from the aspects of principles of list preparation, characteristics of the list, list workload, item lacking and repeated checking.%为规避风险,实现企业增效,以国际工程“交钥匙”项目为例,从清单编制原则、清单特征描述、清单工程量、清单漏项、重复校核等方面讨论了国际工程EPC合同模式下对工程量清单校核的重要性。
展开▼