本文通过对某型舰主机基座安装技术要求及工艺难点进行综合分析,并对该型舰主机基座安装阶段前移的可行性进行了研究。%This paper studies the feasibility on advancing the time of installing main engine foundation for a certain naval vessel after a comprehensive analysis of the workmanship to be desired in the installation.
展开▼