首页> 中文期刊>地震 >2010年青海玉树7.1级地震的前震识别及短临预报可能性研究

2010年青海玉树7.1级地震的前震识别及短临预报可能性研究

     

摘要

An MS7. 1 earthquake hit Yushu area in Qinghai province on April 14th, 2010, and there was a foreshock with MS4. 7 two hours before the main event. According to our analysis, some typical precursory seismic patterns appeared before the earthquake, e. g. seismic gap, seismic band, increased activity, seismicity quiescence, and evolution of those seismic patterns before the MS7. 1 earthquake exhibit a course very similar to that found for earthquake cases with Ms≥7. By tracking the pattens and their evolution, it is possible to identify the foreshock from general middle shocks. Finally we have confirmed the reliability of this method.%2010年4月14日青海玉树发生了7.1级地震,在震前2小时发生了一次4.7级前震.分析表明,玉树7.1级地震前一些主要的地震活动异常多有显示,例如空区、条带、增强和平静等,且与7级大震震例比较,这些前兆地震活动图像的演变具有类似的过程.跟踪这些图像及其演变有可能识别前震.最后评估了该识别方法的可信度.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号