首页> 中文期刊> 《地质学期刊(英文)》 >Geological Model of Mae Tang-Mae Ngad Diversion Tunnel Project, Northern Thailand

Geological Model of Mae Tang-Mae Ngad Diversion Tunnel Project, Northern Thailand

             

摘要

Most of infrastructure projects around the world have to focus on a clear understanding of geological model which may be determined from various sources of information. The limitation in geotechnical data and budget affects the accuracy of the geological model, particularly for projects of long and deep tunnel of which accessibility to the excavation points is difficult and far reaching. Therefore, an approach adopted for interpretation plays an important role in the level of uncertainty of the derived geological model. This paper focuses on the determination of the geological models at the site of a long water diversion tunnel project in a complex geologic setting in northern Thailand from an approach to understand the relationship between regional tectonic setting and local tectonic condition so that geological structures and rock mass conditions along the tunnel alignment can be assessed for a better planning of tunnel design and construction. The paper describes tectonic settings at regional scale (Northern Thailand and Eastern Myanmar), tectonic features and geologic condition in project area, geotechnical investigation and data along tunnel alignment and predicted tunnel ground behavior.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号