首页> 中文期刊>工程(英文)(1947-3931) >Design of Software for Maintenance Workforce Scheduling (A Case Study of Afam Power Station, Nigeria)

Design of Software for Maintenance Workforce Scheduling (A Case Study of Afam Power Station, Nigeria)

     

摘要

This paper is concerned with the optimization of the workforce scheduling for solving maintenance problems. To achieve this aim an optimsation software for (5, 7) problem was developed. The programme was written in Quick Basic. The software was designed to produce a seven day schedule for organization operating a seven day week. Hence organization operating a five day schedule wishing to change to a seven day schedule we find this software very useful. The Quick-Basic computer programme was based on Alfares [1, 2] algorithm for solving (5,7) schedule problem. Data collected from Afam power station, Nigeria was used as input data. The test result shows the software is capable of determining workforce size and assigning workers to day-off pattern. The seven-day schedule produced savings of 11% maintenance labour cost when compared with the 5-day schedule currently being practiced by the Power station [3].

著录项

相似文献

  • 中文文献
  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号