模具作为一种特殊的产品,在生产加工过程中经常受随机因素的冲击,其计划调度及交货期难以保证,关键加工设备利用率低。本文结合模具生产实际,重点研究了随机冲突的处理方法与过程,给出其生产计划、调度系统的组成与实现,通过实例说明这种方法的有效性。%Mould,as a kind of special product,is usually hit by the random factors during the production and processing.As a result,planning,scheduling and time of delivery are difficult to be ensured and the key equipment conflict treatment and put forward a method to construct and realize the planning and scheduling system.Finally,we specify the validity of the method with an example.
展开▼