An offshore pipe-laying and cable-laying barge was designed and built for shengli Offshore Oilfield and for other shallow water oilfields in Bohai Bay.The design scheme of pipe-laying and cable-laying technology for this barge is introduced and discussed,which includes the pipe-laying in the first stage,the normal pipe-laying operation,the installation of riser,the pipe constant tension control,the process of pipe abandon and pipe collection,the control of barge positioning and transportation etc.%介绍了滩海铺管敷缆船管道铺设工艺的设计方案。
展开▼