摘要

During the construction of concrete box girders for the main part of Nan'ao Bridge, the local wind conditions were extremely bad. We analyzed the dynamic characteristics of the structure under the effect of wind loading when the bridge was in its maximum cantilevering position. As there were no similar experience and parameters available, parameters for wind loads were rationally selected on the basis of the data of observation made in the early stage of the project. Safe and reliable measures were taken and the highest allowable wind velocity was scientifically and rationally controlled to effectively avoid the effect of the vertical vortex induced resonance on the quality of concrete.%南澳大桥主桥的混凝土箱梁施工中,当地风环境条件极其恶劣,在成桥最大悬臂状态时,对风荷载作用下的结构动力特性进行计算分析。在无类似相关经验和参数选取的条件下,通过施工前期观测统计,合理选取风荷载参数,采取安全可靠的方案措施,科学合理控制施工最大允许风速,有效避免了竖向涡激共振对浇筑混凝土质量的影响。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号