首页> 中文期刊> 《中国港湾建设》 >吸力筒型基础海上拆除技术

吸力筒型基础海上拆除技术

         

摘要

China offshore oil and gas resources development went into a rapid developing period since 1980s, the offshore oil platforms early constructed are already close to the design life, they will be retired and removed in the future. Steel jacket foundation offshore platform was built in a great number; the installation and removed scheme is mature. Suction can foundation was used since 1990s with rare remove case. Based on an offshore meteorological mast remove project, we introduced 3 kinds of suction can foundation offshore removed schemes combining with the exiting offshore platform remove technologies, carried out the comparative analysis from the technical feasibility and operational safety. All three technical schemes are generally feasibility, but with different operability which needs to be deep studied. The key techniques mentioned in this paper have typical and practical value for other similar suction can structures and jacket foundation structures.%中国近海油气资源开发自20世纪80年代开始进入快速发展时期,早期建设的海上石油平台大多已接近设计寿命,未来将陆续退役并予以拆除.钢制导管架型基础海洋平台建成数量多,安装及拆除方案非常成熟.吸力筒型基础自20世纪90年代才开始在国内使用,拆除案例比较鲜见.结合现有海洋平台拆除技术,以某海上测风塔拆除项目为例,文中提出了3种吸力筒型基础海上拆除技术,从技术可行性、操作安全性角度对3种技术方案的优劣进行了比较分析.3种技术方案总体均可行,但在可操作性上存在差异,仍需进行深入研究.文章所述关键技术对类似吸力筒型结构及常规导管架基础结构都具有典型的工程实际参考价值.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号