Accordilng to‘Technical Criteria for Biodiversity Impact Assessment in Nature Reserve’,The as-sessment of the impacts of Quxiang station and line construction on biodiversity in Everest National Nature Re-serve was made.The outcome indicated that the Station and line construction impact index on the reserve, biodiversity was 16.3975.This showed the influence of the station and line construction on biodiversity of Ever-est National Nature Reserve was small.Countermeasures and suggestions were proposed to reduce ecological risk.%参照《自然保护区生物多样性影响评价技术规范》的要求,对珠穆朗玛峰国家级自然保护区生物多样性因曲乡水电站及线路工程建设造成的影响法进行了评价,结果显示,工程建设对珠峰保护区生物多样性影响指数为16.3975,影响程度为“较小影响”等级,同时结合当地实际情况,提出了保护建议。
展开▼