Mains supply connection requirements for computer room of data center are introduced, as well as the switching scheme for diesel generator, power distribution scheme for data center and backup UPS scheme; discussions have been made for how to improve the reliability of UPS system and ensure the normal and continuous operation of computer room of data center; key ideas are proposed for UPS power scheme for computer room of data center; solutions are offered for load statistics of computer room of data center and UPS backup power.%阐述数据中心机房市政电源接入要求,柴油发电机投切方案,数据中心配电方案,后备UPS方案,就如何提高UPS供电系统可靠性,确保数据中心机房真正不间断运行进行了探讨,提出中心机房UPS电源方案的关键思路,介绍中心机房负载的统计及UPS后备电源的解决方案。
展开▼