北京市轨道交通房山线稻田站—世界公园站区间跨越永定河和稻田水库,永定河中堤为砂砾石均质堤,为了防治液化进行模型试验,为工程提供依据。%In Beijing Light Railway Fangshan Line of the Daotian Station to the world's Park Station across the Yongding River and Daotian Reservoir,the embankment of Yongding River is a homogeneous sand and gravel dike,the model test for the control Liquefaction is maken to provide the basis for the project.
展开▼