首页> 外文学位 >Evaluation of Flood Mitigation Strategies for the Santa Catarina Watershed using a Multi-model Approach.
【24h】

Evaluation of Flood Mitigation Strategies for the Santa Catarina Watershed using a Multi-model Approach.

机译:使用多模型方法评估圣卡塔琳娜州流域的减洪战略。

获取原文
获取原文并翻译 | 示例

摘要

The increasingly recurrent extraordinary flood events in the metropolitan area of Monterrey, Mexico have led to significant stakeholder interest in understanding the hydrologic response of the Santa Catarina watershed to extreme events. This study analyzes a flood mitigation strategy proposed by stakeholders through a participatory workshop and are assessed using two hydrological models: The Hydrological Modeling System (HEC-HMS) and the Triangulated Irregular Network (TIN)-based Real-time Integrated Basin Simulator (tRIBS).;The stakeholder-derived flood mitigation strategy consists of placing new hydraulic infrastructure in addition to the current flood controls in the basin. This is done by simulating three scenarios: (1) evaluate the impact of the current structure, (2) implementing a large dam similar to the Rompepicos dam and (3) the inclusion of three small detention dams. These mitigation strategies are assessed in the context of a major flood event caused by the landfall of Hurricane Alex in July 2010 through a consistent application of the two modeling tools. To do so, spatial information on topography, soil, land cover and meteorological forcing were assembled, quality-controlled and input into each model. Calibration was performed for each model based on streamflow observations and maximum observed reservoir levels from the National Water Commission in Mexico.;Simulation analyses focuses on the differential capability of the two models in capturing the spatial variability in rainfall, topographic conditions, soil hydraulic properties and its effect on the flood response in the presence of the different flood mitigation structures. The implementation of new hydraulic infrastructure is shown to have a positive impact on mitigating the flood peak with a more favorable reduction in the peak at the outlet from the larger dam (16.5% in tRIBS and 23% in HEC-HMS) than the collective effect from the small structures (12% in tRIBS and 10% in HEC-HMS). Furthermore, flood peak mitigation depends strongly on the number and locations of the new dam sites in relation to the spatial distribution of rainfall and flood generation. Comparison of the two modeling approaches complements the analysis of available observations for the flood event and provides a framework within which to derive a multi-model approach for stakeholder-driven solutions.
机译:墨西哥蒙特雷市区的特大洪水事件频发,这引起了利益相关者对了解圣卡塔琳娜水域对极端事件的水文响应的浓厚兴趣。这项研究分析了利益相关者通过参与式研讨会提出的防洪策略,并使用两种水文模型进行了评估:水文建模系统(HEC-HMS)和基于不规则三角网(TIN)的实时综合盆地仿真器(tRIBS)利益相关者制定的防洪战略包括在流域目前的防洪措施之外,再加上新的水力基础设施。这是通过模拟三种情况来完成的:(1)评估当前结构的影响,(2)实施类似于Rompepicos大坝的大型水坝,以及(3)包括三个小型滞留水坝。通过一致应用这两种建模工具,在2010年7月亚历克斯飓风登陆造成的重大洪灾事件中对这些缓解策略进行了评估。为此,将有关地形,土壤,土地覆盖和气象强迫的空间信息进行组合,质量控制并将其输入每个模型。根据来自墨西哥国家水委员会的水流观测值和观测到的最大水库水位,对每个模型进行了校准。模拟分析的重点是两种模型在捕获降雨,地形条件,土壤水力特性和在不同的防洪结构存在下,其对洪水响应的影响。新水力基础设施的实施对缓解洪峰具有积极影响,与集体效应相比,更大的水坝(tRIBS中为16.5%,HEC-HMS中为23%)出口处的洪峰减少更为有利。来自小型结构(tRIBS中为12%,HEC-HMS中为10%)。此外,与降雨和洪水发生的空间分布有关,缓解洪峰的能力在很大程度上取决于新水坝场址的数量和位置。两种建模方法的比较补充了对洪水事件可用观测值的分析,并提供了一个框架,在该框架内可以得出针对利益相关者驱动的解决方案的多模型方法。

著录项

  • 作者

    Cazares-Rodriguez, Jorge E.;

  • 作者单位

    Arizona State University.;

  • 授予单位 Arizona State University.;
  • 学科 Civil engineering.;Environmental engineering.
  • 学位 M.S.
  • 年度 2016
  • 页码 152 p.
  • 总页数 152
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 11:47:05

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号