The application of BIM and IPD in public design and construction.

机译:BIM和IPD在公共设计和施工中的应用。

获取原文
获取原文并翻译 | 示例

摘要

Building Information Modeling (BIM), as the newest entrant to the firmament in construction industry, consists of a technological tool. It can hold large amounts of data--spatial, schedule and cost, accounting, procurement. It also permits users to explore various building designs at the earliest possible stage as well as the relationships among design, constructability, schedule and budget. BIM provides a common language and platform for the project delivery system, especially Integrated Project Delivery (IPD), to communicate, collaborate and coordinate among the multiple project stakeholders. BIM and IPD are widely used in private sector projects, while public owners, such as New York City, face several constraints including a series of procurement requirements imposed by Federal, State and Local legislative statutes. This research outlines the existing constraints and develops an Integrated Design-Bid-Build (IDBB) project delivery model that will provide an opportunity for public entities to adopt many BIM functions and IPD principles into their design and construction process. The framework is developed for New York City public works, which is often required to award construction contracts by lowest price, responsive and responsible bid criteria. The advantages and disadvantages of implementation of IDBB are summarized in this research.;Since public works projects, such as in the Department of Design and Construction (DDC) are constrained by procurement legislature and cannot fully apply BIM functions and IPD principles, the proposed IDBB provides a platform to employ many benefits of BIM and IPD. This research used change orders as the project measurement variable. Change orders were organized by categories which were then used to map BIM functions and IPD principles to evaluate possible change order reduction by implementing IDBB. The IDBB model can be quantified by using a developed evaluation tool. Then a change order forecasting model was developed using Bayesian statistics, which help to create the cause and effect relationship between BIM functions and IPD principles with change orders categories. BIM functions and IPD principles will help to reduce parts of the change orders in DDC projects. But there are still some remaining change orders that need to be addressed. Therefore, a contingency calculation model is also proposed in this environment to prevent a cost overrun.;By using the cost benefits analysis model, a case study was conducted on a controlled experiment project called System Mechanical Engineering Facility III (SMEFIII). IDBB was performed within DDC regulations and restraints. The findings indicate that IDBB can help New York City DDC greatly reduce design errors, design omissions and field condition types of change orders. Better implementation of IDBB can also mitigate risks of project cost overrun. Recommendations from the case study analysis include encouraging strong leadership on the part of the owner and the compensation structure needs to be carefully designed to both buffer cost overruns and serve as a profit incentive. IDBB, as an alternative project delivery method, allows public agencies to enjoy the benefits of BIM and IPD to the fullest extent possible.
机译:建筑信息模型(BIM)作为建筑行业中的最新事物,由一种技术工具组成。它可以容纳大量数据-空间,计划和成本,会计,采购。它还允许用户尽早探索各种建筑设计以及设计,可施工性,进度和预算之间的关系。 BIM为项目交付系统(尤其是集成项目交付(IPD))提供了一种通用语言和平台,以在多个项目涉众之间进行沟通,协作和协调。 BIM和IPD广泛用于私营部门项目中,而纽约市等公共所有者则面临一些限制,包括联邦,州和地方立法法规施加的一系列采购要求。这项研究概述了现有的约束条件,并开发了一个集成设计投标构建(IDBB)项目交付模型,该模型将为公共实体提供在其设计和建造过程中采用许多BIM功能和IPD原理的机会。该框架是为纽约市公共工程开发的,通常需要以最低的价格,敏感的负责任的投标标准来授予建筑合同。这项研究总结了实施IDBB的利弊。;由于设计和建设部(DDC)等公共工程项目受到采购立法的限制,并且不能完全应用BIM功能和IPD原则,因此建议的IDBB提供了一个平台,可以利用BIM和IPD的许多优点。本研究使用变更单作为项目度量变量。变更单按类别进行组织,然后用于映射BIM功能和IPD原则,以通过实施IDBB评估可能减少的变更单。可以使用开发的评估工具对IDBB模型进行量化。然后,使用贝叶斯统计数据开发了变更单预测模型,该模型有助于在BIM功能和具有变更单类别的IPD原理之间建立因果关系。 BIM功能和IPD原则将有助于减少DDC项目中的部分变更单。但是仍然有一些剩余的变更单需要解决。因此,在这种环境下还提出了一种应急计算模型,以防止成本超支。通过使用成本效益分析模型,对一个名为“系统机械工程设施III(SMEFIII)”的受控实验项目进行了案例研究。 IDBB是在DDC规定和限制内执行的。调查结果表明,IDBB可以帮助纽约市DDC大大减少设计错误,设计遗漏和变更单的现场条件类型。更好地实施IDBB还可以减轻项目成本超支的风险。案例研究分析的建议包括鼓励所有者加强领导,并且需要精心设计薪酬结构,以缓冲成本超支和利润诱因。 IDBB作为一种替代的项目交付方法,使公共机构可以最大程度地享受BIM和IPD的好处。

著录项

  • 作者

    Liu, Mei.;

  • 作者单位

    Polytechnic Institute of New York University.;

  • 授予单位 Polytechnic Institute of New York University.;
  • 学科 Engineering Civil.
  • 学位 Ph.D.
  • 年度 2013
  • 页码 197 p.
  • 总页数 197
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号