声明
Contents
ACKNOWLEDGEMENTS
ABSTRACT
CHAPTER ONE INTRODUCTION
1.1.Background of the Project
1.1.1.The scope of the project (study)
1.1.2.Project stakeholders
1.2.Problem Statement
1.2.1.State of Zanzibar Economy
1.3.The significance of the Research
1.4.Research Objectives
1.4.1.General objective
1.4.2.Specific objectives
1.5 Research questions
CHAPTER TWO
2.2.1 Definition of Project
2.2.2.Definition of Risk
2.2.3.Risk Management
CHAPTER THREE
3.1.Study area
3.2.Research design
3.2.1.Case Study Introduction
3.2.2 Case study
3.3.Data Sources
3.4.Data collection Methods and tools
3.4.1.Questionnaire
3.4.2.Interview
3.5.Sampling of respondents
3.5.1.Sampling frame
3.5.2.Sampling Unit
3.5.3 Sample size
3.6 Data processing,Analysis,and Presentation
3.7.Limitation of the Study
CHAPTER FOUR
4.0.RESULTS AND DISCUSSION
4.1 Profile of the Respondents
4.2.Educational Qualification of the Respondents
CHAPTER FIVE
5.0.CONCLUSIONS AND RECOMMENDATIONS
REFERENCES
APPENDIX
山东大学;
Chinese construction company; identify key risks; all project life cycle;