COMMENCEMENT BAY CASE STUDIES OF ENVIRONMENTAL DREDGING RESIDUALS

机译:开挖湾环境残渣案例研究

获取原文
获取原文并翻译 | 示例

摘要

A critical issue in the initial evaluation, final design, and implementation of contaminated sediment dredging projects is assessment and management of residual contaminants that may remain after dredging is completed. Residuals can be composed of both "generated residuals" left by the dredging operation and "undisturbed residuals" remaining below the dredge prism or actual dredge cutline due to dredging inaccuracies, accuracy in defining the contaminated surface, or other factors. No removal technology can remove every particle of contaminated sediment, and field results to date suggest that post-dredging residual contamination levels often have not met desired cleanup action levels. Currently there is no commonly accepted method to predict the degree of generated residual sediment resulting from different dredges applied to different environmental settings.This paper summarizes several Commencement Bay area and national case histories that have characterized the amount of generated residuals, and discusses key design and construction considerations relevant to the assessment and management of residuals. Environmental dredging residual data are evaluated relative to operational factors and key site characteristics such as the presence of hardpan/bedrock, debris, and relatively low dry density sediment. Post-construction management strategies are also discussed.
机译:在初步评估,最终设计和实施受污染的泥沙疏projects项目中,一个关键问题是对疏dr完成后可能残留的残留污染物进行评估和管理。残留物可由挖泥作业留下的“产生的残留物”和由于挖泥不准确,确定受污染表​​面的精度或其他因素而残留在挖泥机棱柱或实际挖泥机截割线以下的“未残留残渣”组成。没有清除技术可以清除受污染的沉积物的每个颗粒,迄今为止的田间调查结果表明,疏post后的残留污染物水平通常未达到所需的清理措施水平。当前尚没有一种普遍接受的方法来预测因在不同环境环境中使用不同挖泥机而产生的残余沉积物的程度。本文总结了一些具有特征性残余物残留量的开垦湾地区和国家案例历史,并讨论了关键设计和方法。与残渣评估和管理有关的施工考虑。相对于操作因素和关键现场特征(例如是否存在硬盘/基岩,碎屑和相对较低的干密度沉积物)评估环境疏residual残余数据。还讨论了施工后的管理策略。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号