PERFORMANCE OF EMBANKMENT AND FOUNDATION CUT-OFF AT ARMINOU DAM, CYPRUS

机译:塞浦路斯阿米诺乌坝的路堤和地基切断性能

获取原文
获取原文并翻译 | 示例

摘要

Arminou dam, a 42 m high gravel fill dam with central clay core, was constructed in the period 1995-1998. A single 0.8m wide plastic concrete diaphragm wall, together with adjacent bentonite cement alluvial grouting, provides a seepage cut-off through the 15 m depth of alluvium in the valley floor. The paper describes the instrumentation that was installed in the dam, and assesses the readings that were obtained during construction and first impounding. The paper also describes the exhumation of the trial panels for the diaphragm wall, and the significance of the finding of bentonite infill to construction joints between panels to both dam safety and the risk of hydraulic fracture of the diaphragm wall. It concludes that the performance of the dam has been satisfactory, but recommends further research into hydraulic fracture of diaphragm walls, and related issues.
机译:1995年至1998年期间建造的Arminou大坝是一座高42 m的砾石大坝,带有中心粘土芯。一块0.8m宽的塑料混凝土隔板墙,再加上相邻的膨润土水泥冲积灌浆,可在谷底15m的冲积层中提供渗流截留。该论文描述了安装在大坝中的仪器,并评估了在建造和首次蓄水期间获得的读数。本文还描述了隔板墙试板的挖掘,以及发现膨润土填充物到隔板之间施工缝的重要性,这对于大坝安全和隔板墙发生水力破裂的风险均具有重要意义。结论是大坝的性能令人满意,但建议进一步研究隔膜墙的水力压裂及相关问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号