Itaipu dam has been in operation since 1982. The instruments of the monitoring system were installed during construction, so that there are many with more than two decades of records. From the interpretation of their results it became apparent that it was necessary to reevaluate the control values of many instruments, which were calculated according to criteria, properties and conditions established during the initial stage of the project for design purposes. In order to determine these values, two and three-dimensional mathematical models were elaborated taking into account the "as built" characteristics of the dam and its foundations. The calibration of the models was carried out so that the calculated values of dam deflections and rock deformations agreed with the measured ones for the same loading and temperature conditions. The main features of the models, the criteria defined and the results obtained are presented.
机译:伊泰普水电站大坝从1982年开始投入使用。在建造过程中安装了监测系统的仪器,因此有许多记录超过二十年。从对结果的解释中可以明显看出,有必要重新评估许多仪器的控制值,这些控制值是根据项目初期为设计目的而建立的标准,特性和条件计算得出的。为了确定这些值,考虑了大坝及其基础的“建成状态”,精心设计了二维和三维数学模型。对模型进行了校准,以便在相同的载荷和温度条件下,坝体挠度和岩石变形的计算值与实测值一致。介绍了模型的主要特征,定义的标准和获得的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号