Manitoba Hydro is proposing to develop the Keeyask Generation Project, a 695-megawatt hydroelectric generating station in northern Manitoba, located approximately 725 km northeast of Winnipeg at Gull Rapids on the lower Nelson River. One of the key components of the Keeyask infrastructure project is the design and construction of approximately 25 km of two-lane access all-weather road from the junction of Provincial Route 280 to the proposed Keeyask Generating Station. The road will provide access to the site during construction and during the operational life of the generating station. The construction of the access road will require a clear span bridge crossing at Looking Back Creek. A clear span is preferred at this bridge site to minimize potential environmental impacts and to avoid damaging fish habitat. The bridge is a 30 m clear span structure with a clear roadway width of 13.5 m. The bridge deck is 150 mm thick concrete and acts compositely with the 1200 mm deep partially prestressed concrete box girders. The girders are supported at each end by two integral abutments founded on driven steel 'H' piles. This bridge is required to carry extremely heavy vehicular loads including a 136,365 kg capacity articulating low-bed tractor trailer that will be used to haul large transformers and equipment to the Keeyask Generating Station. The loading equates to about twice the Manitoba Infrastructure and Transportation Provincial Trunk Highway standard design truck weight. The bridge was also required to be designed to accommodate loads from a CAT 740 articulated truck used in hauling rock and aggregate. There are many challenges to the design and construction of this bridge at this remote northern Manitoba site including: design to accommodate heavy vehicular loads, shipping and erecting girders, permafrost protection, and protection of a sensitive environmental site. The construction of the bridge started in March 2012 and was completed and opened to traffic in January 2013.
机译:曼尼托巴水电公司(Manitoba Hydro)正在提议开发Keeyask发电项目,这是一个位于曼尼托巴省北部的695兆瓦水力发电站,位于温尼伯东北约725公里,位于尼尔森河下游的古拉皮兹(Gull Rapids)。 Keeyask基础设施项目的关键组成部分之一是从省道280号交界处到拟建的Keeyask发电站的大约25公里的两车道全天候道路的设计和施工。该道路将在发电站的建设和运营期间提供通往工地的通道。通道的建设将需要在Look Back Creek上有一个跨距清晰的桥梁。在此桥梁工地上最好有一个跨距,以最大程度地减少对环境的潜在影响并避免破坏鱼类的栖息地。该桥为30 m净跨度结构,净车道宽度为13.5 m。桥面板为150毫米厚的混凝土,并与1200毫米深的部分预应力混凝土箱梁共同作用。大梁的两端均由两个整体式基台支撑,该基台位于从动钢“ H”形桩上。该桥需要承载极重的车辆负荷,包括可装载136,365公斤的铰接式低底盘拖车,该拖车将用于将大型变压器和设备拖至Keeyask发电站。装载量相当于曼尼托巴基础设施和运输省省干线公路标准设计卡车重量的两倍。还要求桥梁的设计能够承受CAT 740铰接式卡车运输岩石和集料的负载。在曼尼托巴北部偏远地区,这座桥梁的设计和施工面临许多挑战,其中包括:承受重载车辆的设计,运输和架设大梁,永久冻土保护以及对敏感环境场所的保护。这座桥的建设于2012年3月开始,并于2013年1月建成并通车。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号