DESIGN AND CONSTRUCTION OF FLORIDA’S FIRST SPLICED CURVED CONCRETE U-GIRDER BRIDGES: THE SR 417 AND BOGGY CREEK ROAD INTERCHANGE

机译:佛罗里达州第一座弯弯混凝土U形桥的设计与建造:SR 417和崎C的弯道交汇处

获取原文
获取原文并翻译 | 示例

摘要

The new SR417 and Boggy Creek road interchange, which will soon begin construction, includes two new bridges employing spliced post-tensioned curved concrete U-girders. These systems have been extensively used in Colorado, but have yet to be constructed in Florida. Fly-over ramps were initially designed with steel box girders, but spliced precast concrete U-girders were eventually selected as an economical alternative. During the design phases of this design/bid/build project, coordination with PCI, the Colorado DOT, and other design firms was integral to developing economical design details, taking advantage of experience gained from previously completed projects.rnFly-over ramps had varying span lengths up to 220’, total lengths between 1411’ and 2708’, and a minimum horizontal radius of 955’. A full 3D computer model was developed using the RM Bridge software package, which had the capability to analyze static and time-dependent loading conditions resulting from the staging and erection sequences required during construction. The project utilizes standard cross-sections and details developed and published by PCI. This paper will discuss general details of the two bridges, the analysis procedures that were used, and the lessons learned from the design and production process of Florida’s first set of spliced post-tensioned curved concrete U-girder bridges.
机译:新的SR417和Boggy Creek公路立交桥即将开始建设,其中包括两座新桥,它们采用拼接的后张弯混凝土U形梁。这些系统已在科罗拉多州广泛使用,但尚未在佛罗里达州建造。架空桥最初是用钢箱梁设计的,但是最终选择了拼接的预制混凝土U形梁作为一种经济的选择。在此设计/投标/建造项目的设计阶段中,与PCI,Colorado DOT和其他设计公司的协调对于开发经济的设计细节是必不可少的,这要利用从先前完成的项目中获得的经验。最大长度为220',总长度在1411'和2708'之间,最小水平半径为955'。使用RM Bridge软件包开发了完整的3D计算机模型,该模型具有分析静态和随时间变化的加载条件的能力,这些加载条件是由施工过程中所需的分段和安装顺序导致的。该项目利用了由PCI开发和发布的标准横截面和细节。本文将讨论这两座桥梁的一般细节,所使用的分析程序以及从佛罗里达第一套拼接后张紧弯混凝土U型梁桥的设计和生产过程中汲取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号