首页> 外文会议>Transactions of the SPWLA >REDUCING COMPLETION FAILURE RISK IN THE SLIM HOLE WORLD USING FPWD TOOLS
【24h】

REDUCING COMPLETION FAILURE RISK IN THE SLIM HOLE WORLD USING FPWD TOOLS

机译:使用FPWD工具降低修井世界的完工失败风险

获取原文
获取原文并翻译 | 示例

摘要

Shell continues to push the LWD slim hole envelope at its Gulf of Mexico Brutus field with world firsts by running Sperry Sun’s 4 ?” GeoTap FPWD (Formation Pressure While Drilling) and Rotary Steerable tools. Developing slim hole technology is critical in fields such as Brutus with only an eight slot TLP and field redevelopment limited primarily to a slim hole (5 ?” casing) environment. In addition, acquiring pressures to identify differentially depleted layers in completion intervals is critical to completion integrity. Acquiring formation pressures while drilling has become the method of choice to acquire pressures in highly depleted sands while minimizing borehole exposure and cost by eliminating wire line runs and wiper trips.The GeoTap/Quad combination was used on four wells at Brutus. In the A-3 well, with 6000 psi overbalance, 11 pressures were acquired to identify a differentially depleted layer within the J2 interval. Data acquired was used to modify the completion interval to reduce the failure risk associated with differential depletion. The well was cased and completed with no issues and has performed above expectations. In the A-7 wells FPWD/Quad evaluation strings were run and fifteen pressures were acquired. No differential depletion was observed and the entire zone was completed and is producing as expected. The A-5ST3 well was also drilled and evaluated with an FPWD/Quad and 20 pressures were acquired. Formation pressure data while drilling was used to modify mud weights, evaluate zones for possible uphole recompletions, and confirm the presence of differential depletion. As with the A-3 well, the FPWD data was used to modify the completion interval and the well has performed above expectations.Over the course of four slimhole FPWD runs at Brutus, numerous advancements in operational procedures have been implemented. These include the use of three versus two drawdowns to reduce or eliminate minor supercharging, along with monitoring the difference between pumps-on versus pumps-off pressure acquisition, which indicated a difference of less than one psi in Brutus type (half-Darcy to Darcy unconsolidated Plio-Pliocene) sands. This knowledge enabled the team to acquire high quality data, reduce the risk of sticking the BHA, and increase hole cleaning while continuously circulating.
机译:壳牌公司通过经营Sperry Sun的4号钻机继续在墨西哥湾布鲁图斯油田推动随钻测井超薄井壁作业,并获得世界首创奖。” GeoTap FPWD(钻井时的地层压力)和旋转导向工具。在诸如Brutus之类的领域中,开发只有8个插槽的TLP的细长孔技术至关重要,而现场再开发主要限于细长孔(5?”套管)环境。另外,获得压力以识别完井间隔中的差异性贫化层对于完井完整性至关重要。在钻井过程中获取地层压力已成为一种选择方法,可在高度贫化的砂岩中获取压力,同时通过消除电缆走线和刮水器跳闸来最大程度地降低井眼暴露和成本。GeoTap / Quad组合用于Brutus的四口井。在具有6000 psi过剩平衡的A-3井中,获取了11个压力以识别J2区间内的差耗层。所获取的数据用于修改完成间隔,以减少与差异耗竭相关的故障风险。这口油井的情况良好,完工无问题,并且表现超出预期。在A-7井中运行FPWD / Quad评估管柱,并获得15个压力。没有观察到差异性消耗,并且整个区域均已完成,并按预期生产。还钻了A-5ST3井,并用FPWD / Quad进行了评估,并获得了20个压力。钻井时的地层压力数据用于修改泥浆比重,评估可能的井上再完井区域,并确认存在差异性消耗。与A-3井一样,FPWD数据也被用来修改完井间隔,并且井的性能超出了预期。在Brutus进行的四口超细孔FPWD运行过程中,已实现了许多操作程序上的进步。这些措施包括使用3次降压与2次降压来减少或消除较小的增压,并监测泵开启与关闭时压力采集之间的差异,这表明Brutus型的差异小于1 psi(Darcy到Darcy的一半)未固结的上新世)。这些知识使团队能够获取高质量的数据,降低粘附BHA的风险,并在连续循环的同时提高孔的清洁度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号