首页> 美国政府科技报告 >Slim-Hole Drilling and Completion Barriers. Final Report, July 1993-April 1995
【24h】

Slim-Hole Drilling and Completion Barriers. Final Report, July 1993-April 1995

机译:细孔钻孔和完井障碍。最终报告,1993年7月至1995年4月

获取原文

摘要

An industry team consisting of Maurer Engineering Inc., BJ Services, Baker OilTools, Halliburton Energy Services, and Advanced Resources International investigated technical issues and barriers related to slim-hole techniques in the areas of drilling, logging, cementing, perforating, stimulation, and completion and workover tools. Producer and service company interviews and literature reviews were used as additional sources of information. An anlaysis of U.S. slim-completion activity and trends was performed by obtaining a customized database from Petroleum Information Corp. A comprehensive questionnaire was constructed and distributed to a targeted sample for analysis of industry perceptions regarding slim-hole barriers. A case study of a very active basin where slim completions are regularly utilized, the Denver-Julesberg Basin, was performed.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号